One Priority Date In. Every Deadline Out.
Paris Convention, PCT Chapter II and national phase — the whole downstream calendar from a single date, ordered by how soon each one bites.
Treaty periods. Individual offices vary, and several allow 31 months rather than 30 for national phase entry. Confirm per jurisdiction before relying on a date.
Enter your earliest priority date to see every downstream deadline.
What Each Date Means
The Deadlines That Decide Where You Have Rights
Every one of these is measured from the same earliest priority date, which is why getting that date right matters more than any of them individually.
Getting the Base Date Right
Everything Hangs on the Priority Date
Every deadline above is an anniversary of one date. If that date is wrong, all of them are.
It is the EARLIEST filing
Including a provisional, and including a filing in another country. Not the non-provisional, and not the PCT date where an earlier application exists.
A family can have several
Different claims can carry different priority dates where matter was added. For deadline purposes the earliest governs; for prior art each claim stands on its own.
Losing it is usually permanent
Miss the window and your own disclosures become citable against you. Restoration exists in some offices but is discretionary and narrow.
Weekends usually roll forward
Most offices extend a deadline falling on a closed day to the next working day. This tool shows the raw anniversary, which is always the safe date to work to.
Frequently Asked Questions
Common questions about this service
How long do I have to file abroad after my first filing?
Twelve months for patents and utility models under Article 4C of the Paris Convention, measured from your earliest filing anywhere. File within that window and your foreign applications are treated as though they were filed on the original date. For industrial designs and trade marks the period is six months, not twelve — a difference that catches people out regularly.
When is the PCT national phase deadline?
Thirty months from the earliest priority date in most countries, under Articles 22 and 39 of the PCT. A number of offices — including the EPO — allow 31 months. The deadline is per-country, so a portfolio entering six jurisdictions can have two different dates, and missing one loses that country only.
Does filing a PCT application extend my patent term?
No. It defers cost and decision-making, not the term. The 20-year US term runs from the PCT international filing date where one is claimed, so the months spent in the international phase come out of the enforceable life rather than being added to it.
What happens if I miss the 12-month priority deadline?
You can usually still file, but without the benefit of the earlier date — which means your own published or disclosed material, and anything a third party filed in the intervening year, can now be cited against you. Some offices allow restoration of priority within a further two months on strict grounds, but it is discretionary and not available everywhere.
Do these dates move if they fall on a weekend?
Generally yes. Most offices extend a period that ends on a day they are closed to the next working day — the USPTO does so under 37 CFR 1.7. This calculator shows the raw calendar anniversary, which is the conservative date. Filing on it is always safe; relying on an extension means confirming the specific office is closed that day.
More Free Tools
Other Calculators You May Need
The same dates rarely come up alone — a term question usually brings a fee question with it.
Patent Term & Expiry Calculator
When does a patent expire? Utility, design and plant terms, with adjustment, extension and terminal disclaimers.
Open the calculatorMaintenance Fee Calculator
Every USPTO fee date from the grant date, with windows, grace periods and the total cost of keeping a patent alive.
Open the calculatorAll free IP tools
The full set of calculators, with the statute behind each rule and what they deliberately do not try to answer.
See every toolDeadlines You Do Not Have to Remember
We docket the whole family against the official record — priority, national phase, office actions and renewals — and chase the instruction before each window closes.
- Priority and national phase tracked per jurisdiction
- Reminders that escalate as the date approaches
- Office action and renewal deadlines in the same calendar
- Reconciled against the register, not against a spreadsheet
Talk to Us About Docketing
Tell us the size of the portfolio and where it is filed. We scope and quote before anything starts.
Enquire Now Get Free Consultation🔒 All information submitted is held in strict confidence.